City of Phoenix Well Site 288 289
| Project Owner: City of Phoenix |
Date: April 1997 |
Location: Phoenix |
![]() |
![]() |
![]() |
Project Description
City of Phoenix well sites 288 and 289 consisted of outfitting two wells with deep high voltage 4160 submersible pumps and controls. No storage tanks were used, but instead the wells fed directly into the City’s distribution system. Hydro tanks were installed at each site to maintain pressure, as well as chlorination systems to assure disinfection before entering the system.


